Course profile · Technology

OT: Are You Ready for CCSPA?

A free, practical course for OT teams on Canada's Critical Cyber Systems Protection Act: six short videos and six fillable worksheets that turn the Act into plant work you can start now.

Free56 minutes8 lessonsIntroductory
OT: Are You Ready for CCSPA? course preview cover

Outcome-focused

What You Will Learn

01

Score your organization against ten points of evidence, from 0 to 20, and know which gaps to close first

02

Draw the boundary of your critical cyber systems from the vital service backwards, with a reason for every decision

03

Map the security program you already run to what the Act asks, and find the gaps existing programs usually leave

04

Put every supplier with standing access to critical OT on one register, and check four things in each contract

05

Build a reporting path from the first operator signal to a report, and test it with a one-hour drill

06

Prepare a receiving role, a vendor confidentiality route and compensating controls for a confidential government direction

About this course

About This Course

The Critical Cyber Systems Protection Act is Part 2 of Bill C-8. It received Royal Assent in June 2026. As of November 2026 it is not in force: no operators have been designated, no regulations have been published and no in-force date has been announced. The course and its worksheets are dated, and every detail that waits for regulations is marked, so check the Canada Gazette for anything that has changed since November 2026.

This course is about the OT work behind the Act. Each legal point gets a sentence, then the course shows what it means in a plant, using a fictional gas pipeline as the worked example.

You start with a ten-point self-check and a score. Each of the next five lessons fixes a group of weak points: scoping, your existing program, suppliers, incident reporting, and confidential directions. Each one comes with a fillable worksheet you can use on your own site.

A consultant will ask your team for these same facts, and a free template only gives you headings. This course helps you gather your own evidence first, so any outside help starts from your site and not from a blank page. It is practical training built on the Act's own text, not legal advice.

Is this for you?

Who this course is for

  • OT security leads and control and automation engineers at federally regulated pipelines, power lines, nuclear facilities, rail, marine and aviation operators
  • Plant, operations and compliance managers who will own the program
  • Integrators, equipment makers and service providers whose customers will pass the Act's expectations on through contracts
  • Provincially regulated operators who want to know what their federally regulated partners will ask of them

Before you start

Requirements

  • You can start without having read the Act.
  • A working knowledge of OT systems such as PLCs, HMIs and SCADA helps.

Inside the course · 8 lessons

Course outline

01

What Is in This Mini-Course

What the six lessons cover, how the worksheets work and where to start.

02

OT: Are You Ready for CCSPA?

Score your readiness on ten points of evidence and see which gaps to close first.

03

Which of Your OT Systems Are Critical Cyber Systems?

Draw the boundary box by box, with in, conduit, dependency or out decisions.

04

You Already Have Half a CCSPA Program

Map an existing program to the Act and assemble the evidence pack.

05

Suppliers With Standing Access

Build the access register, check four contract clauses and set a change trigger.

06

The CCSPA Reporting Clock in a Control Room

Decide what is potentially reportable without waiting for a root cause, and drill it.

07

The Confidential Direction: When Ottawa Orders a Change in Your Plant

What a confidential direction can and cannot require, and four things to have ready.

08

What's Next

Where to take your score and your worksheets after the course.

Included materials

More than the videos

  • CCSPA Readiness Self-Check (fillable PDF and Word)
  • Critical Cyber System Scoping Worksheet (fillable PDF, Word and Excel)
  • Program Crosswalk (fillable PDF and Excel)
  • Supplier and Remote Access Checklist (fillable PDF and Excel)
  • 72-Hour Drill Card, printable for the control room (fillable PDF and Word)
  • Direction Readiness One-Pager (fillable PDF and Word)

Keep learning

Related courses

Enrol for free