Written for control engineers, OT security leads and the IT security staff now responsible for a plant

“ICS/OT Incident Response Drills and Exercises”

Make Sure the First Test of Your OT Incident Response Plan Is a Drill, Not the Real Thing

Utilities under NERC CIP-008-6 must test their incident response plan at least once every 15 months. This edition shows you how to start small: one line of your plan, one question, a 15-minute drill your night shift can run.

Built on public sources: CISA Tabletop Exercise Packages, NERC CIP-008-6, the TSA Security Directives, and the E-ISAC and SANS analysis of the Ukraine attack

What the Book Stands On

Real incidents and public guidance, not opinion

It retells the December 2015 attack on three Ukrainian power companies: the screens taken over, the backup power cut, the phones flooded, and crews restoring power by hand within hours.

E-ISAC and SANS, March 2016

Follows Norsk Hydro through the 2019 ransomware attack: the network cut, plants switched to manual operation, no ransom paid, and a public briefing every day while it recovered.

Hydro and Microsoft, 2019

The exercise formats draw on the public CISA Tabletop Exercise Packages, and the testing chapters follow what NERC CIP-008-6 and the TSA pipeline directives require you to test.

CISA, NERC and TSA documents

What You'll Learn in this Book

Twenty chapters in six parts, 329 pages, from auditing the plan you have to designing and running your own drills, plus eleven printable templates

  • Why a plan on file is not a tested plan, and how to audit yours for what an IT template leaves out
  • How to define safe states and manual fallback before the day you need them
  • What an operator should report, and when, using a layer-by-layer list of OT indicators of compromise
  • How to run two kinds of tabletop: one for the executives who make the shutdown call, one for the technicians who work the playbook
  • Who must be told and by when, and what NERC CIP-008-6 and the TSA directives expect as test evidence
  • How to turn findings into fixes with an after-action report, and plan a year of drills around your outages
  • How to design a 15-minute drill in six steps, from one line of your plan
  • Three drill cards worked in full: a USB stick at console 3, a breaker SCADA calls closed while the crew says open, and a vendor session nobody booked
  • How to build a tabletop in six steps, from scope to the package your facilitator carries into the room
  • How to run the room: what to do when it goes quiet, or one voice takes over
  • How to debrief in five minutes, then run the drill again and record what changed
  • Exercise QUIET FEEDER: a ransomware tabletop at a fictional electric cooperative, written out in full

Everything You Get for $9.99

The Book, PDF and EPUB

Twenty chapters in six parts, 329 pages. Print the PDF for the exercise room, or read the EPUB on a phone or tablet.

Value $9.99

The Drill Design Kit

The drill design worksheet and the two-sided drill card template.

Value $27

The Tabletop Build Workbook

Six steps from scope to the package, on paper.

Value $27

The Exercise Lead Run Sheet

What to say and do from opening the room to the hot wash.

Value $17

The Plan Audit and Field Kit

The OT incident response plan audit checklist, the OT indicators quick reference, the OT IR field kit and the questions for consideration.

Value $47

The Scenario, Recovery and Calendar Templates

The OT scenario design template, the recovery readiness checklist and the 12-month OT drill cadence.

Value $37

TOTAL VALUE: $164.99. Your price: $9.99

You're Covered By Our 30-Day Money-Back Guarantee

If the book isn't what you needed, for any reason, write to us through the Contact page within 30 days of your order and we refund you in full.

Read the Refund Policy and Terms and Policies.

Who Wrote It

HK School of Management and Technology

HK School of Management and Technology trains the people who run the work: project managers, Scrum Masters, engineers and security teams. On the industrial side we teach the free Industrial Control Systems Introduction course and ICS/OT Cybersecurity Fundamentals on hksmnow.com.

This book is the companion to our ICS/OT Incident Drills and Tabletop Exercises course. This edition adds the hands-on side: designing short drills, building a tabletop and running the room. It puts the whole method in one place, so it can sit on the desk while you plan the exercise.

ICS/OT Incident Response Drills and Exercises cover

Get the Book for $9.99

Total value $164.99. Yours today for $9.99. Covered by our 30-day money-back guarantee.