HKSM › Books › ICS/OT Incident Response Plan: Write One That Works › ICS/OT Incident Response Plan: Write One That Works

ICS/OT Incident Response Plan: Write One That Works

ICS/OT Incident Response Plan: Write One That Works — Book Cover

ICS/OT Incident Response Plan: Write One That Works

From Blank Page to Approved Plan, with Templates Operators Can Use at 2 a.m.

Incident response plan templates are easy to find. A plan the night shift can actually use is not. ICS/OT Incident Response Plan: Write One That Works shows the person handed the job, whether an OT engineer, a security lead or a continuity planner, how to take an industrial site's incident response plan from a blank page to four signatures, one chapter at a time, with every worksheet shown filled in for an illustrative water plant.

What This Book Delivers

  • A plan run as a project. Sponsor, charter, planning team, interviews across every shift, and the rules and contracts the plan must satisfy.
  • Decisions made before the alarm. Incidents and severity in plant language, activation levels, and who may isolate, shut down or act when nobody answers.
  • Steps an operator can follow. The first-hour procedure, legal clauses, and one notification matrix for the US, the EU, Canada and Australia.
  • Recovery you can defend. Recovery numbers with honest margins, and written criteria for a safe restart.
  • A plan that stays real. Playbooks, a console card, review rounds, a compliance annex, change triggers, controlled copies and crew training.
  • A standards table in every chapter, and printable, editable templates for every worksheet.

Who It's For

  • OT and control systems engineers asked to write or rewrite their site's incident response plan.
  • OT security leads and IT security professionals responsible for incident response at industrial sites.
  • Operations, safety and business continuity staff who own part of the response.

How It's Structured

  • Chapters 1-2: set up the plan project and gather the inputs.
  • Chapters 3-4: decide what counts as an incident and who decides.
  • Chapters 5-7: write the response, recovery and playbooks.
  • Chapter 8: approve the plan and keep it current.
  • Chapter 9: a complete plan for a fictional electric cooperative, scored like an approver would.
Start Reading

ICS/OT Cybersecurity Fundamentals — Security Built for Industrial Systems

Industrial control systems cannot be secured like ordinary IT. A forced reboot, aggressive scan, or incompatible patch can interrupt production and create real safety consequences. Effective OT security begins with understanding the systems, constraints, and risks unique to industrial environments.

This course gives IT professionals, engineers, operators, and security practitioners a practical foundation in ICS threats, zone and conduit design, risk assessment, passive asset visibility, and vendor evaluation. You will learn how IEC 62443, NIST CSF, and MITRE ATT&CK for ICS apply where availability and safety come first.

Eight reconstructed incidents—including Stuxnet, Triton, Ukraine 2015, Colonial Pipeline, and PIPEDREAM—show how attackers move through OT environments, what they target, and which defenses could have changed the outcome.

Watch the course preview, then build the vocabulary, frameworks, and judgment needed to take credible first steps in ICS/OT cybersecurity.

Explore the Course


ICS/OT Cybersecurity Fundamentals course preview

Write the OT incident plan your site will actually use

Go from a blank page to an approved, usable plan for your industrial site, one chapter at a time. ICS/OT Incident Response Plan: Write One That Works includes 50 videos, the plan template, worksheets and a full model answer, delivered through HKSM Courses for US$147 one-time. 30-day money-back guarantee when 50% or less of the course has been consumed.

Explore the Course