Find the lines nobody has practised.
Audit your plan and pick the line that would fail first.
For the person who has a plan on the shelf and nobody who has practised it
A practical course for control engineers and OT security leads. Design a 15-minute drill from one line of your plan, build a full tabletop, run the room, and keep a record of what each run proved.
51 video lessons, from the plan audit to running a drill twice. 4 assignments, each one with a model answer and a solution video.
TOTAL VALUE: $650
$47 USD one-time
Half price, only with this order
Already have an HKSM account? Use the same email at checkout and the course is added to it.ICS/OT Incident Drills and Tabletop Exercises teaches you to test an industrial incident response plan before an attacker does. It starts small: one line of your plan, one question, fifteen minutes, on a two-sided card a first-time facilitator can run.
Then it scales up. You build a full tabletop in six steps, learn to run the room when people go quiet, and run the same drill twice so you can show what changed. Every method is worked through on a real-looking example first, then you do it yourself and check it against our model answer.

Audit your plan and pick the line that would fail first.
Six steps, one observable objective, one plan line under test.
A two-sided card a first-time facilitator can run without you.
Hand the card to a fresh reader and fix every place they stop.
Scope, objectives, scenario, injects, what good looks like, and the package.
Open it, keep it moving, and handle silence or one loud voice.
Close with a hot wash and a record of what the drill proved.
Repeat the drill and show what changed between the two runs.
Place drills and exercises around your outages and your testing deadlines.

We teach the people who run, maintain and protect industrial systems. Our ICS/OT courses follow one route: understand the threat, write the plan, then test it. This course is the test.
Three short lessons. What the course covers, the route through it, and how to practise without putting your own plant's details at risk.
Drills, exercises and the rules behind them. Audit your plan, run executive and technical tabletops, meet the testing rules, and learn from two real responses.
One plan line, one question, one card. Design a short drill in six steps and build a card anyone on shift can run.
The same method, scaled up. Build a full tabletop in six steps, from scope to the package your facilitator carries into the room.
Facilitate, debrief, record, repeat. Run the session well, close it with a record, and run it again to show what changed.
What to do on Monday. Your first card, your first run, and a year of drills planned around your outages.

A drill card built for your own plant and checked by a cold read. A tabletop outline built from a fact sheet. A facilitator run sheet you can carry into the room. A twelve-month calendar of drills placed around your outages. And the practice of having worked a full ransomware tabletop, Exercise QUIET FEEDER, against a model answer.
This edition is new, so these quotes are from other HKSM courses, each labelled with its course.
★★★★★
"Very clear and crisp, straight to the point."
★★★★★
"Really useful. I will definitely be able to use many of these techniques and prompts. I was not expecting this to be so practical."
★★★★★
"I'm quite familiar with Lean from previous work, but this course is great because it gets to the point and explains concepts clearly. I don't feel like there's any wasted time."
Every lesson sits in our learning site, where you can ask questions in the course discussion forum and share the drill you ran.
You are not working alone. Stuck on a card, unsure what a good answer sounds like, or want another reader on your tabletop? Ask under the lesson.

TOTAL VALUE: $650
Your price: $47 USD One payment, no subscription.
Half price, only with this order
Take the course for 30 days. If it isn't what you needed and you have completed half of it or less, tell us through the Contact page and we refund you in full. The risk is ours, not yours.
Testing it. You design drills, build tabletops and run them. Writing the plan itself is our separate course, ICS/OT Incident Response Plan: Write One That Works.
Three new parts: designing a 15-minute drill, building a tabletop in six steps, and running the room, each with a worked example and an assignment with a model answer. Every lesson from the earlier edition's main part is still there, with a new introduction and a new final word.
Yes. The examples include a water site, an electric cooperative and a vendor connection, and every template is built for any industrial site: manufacturing, energy, water, oil and gas or buildings.
No. Every drill and tabletop in the course is a talk-through. Nobody touches a live system.
No course can. The course shows what NERC CIP-008-6 and the TSA pipeline directives expect you to test, and how to keep a record of each run. Whether your site meets its obligations is judged on your whole program.
Word and PDF files: the drill card template, the design worksheet, the tabletop build workbook, the facilitator run sheet, the plan audit kit, the drill calendar, the scenario template, and the full QUIET FEEDER kit with model answers.
You work at your own pace. Many people design their first card in an evening, after Part 2.
You're covered by our 30-day money-back guarantee. If you've completed half of the course or less, write to us through the Contact page within 30 days and we refund you in full.
No. One payment of $47, with no subscription and nothing to cancel.