Increment

A usable, verified, and approved piece of the product that represents a portion of the total project outcome.

Key Points

  • It is a working slice of the product that delivers real value.
  • It has passed testing and meets the team's Definition of Done.
  • It is formally accepted by the appropriate stakeholder, such as the product owner.
  • Each increment builds on prior increments to move the product toward the final outcome.

Example

At the end of a sprint, the team delivers an integrated reporting feature that passes all automated and manual tests and is approved by the product owner. This feature set is a completed piece of the overall product and can be released if desired, so it is an increment.

PMP Example Question

In an agile project, the team completes a set of features that are integrated, pass all tests, and are approved by the product owner. What is this deliverable called?

  1. Increment
  2. Spike
  3. Epic
  4. Change request

Correct Answer: A — increment (a working, approved piece of the product)

Explanation: An increment is a usable, tested, and accepted portion of the product that contributes to the overall project outcome.

Advanced Lean Six Sigma — Data-Driven Excellence

Solve complex problems, reduce variation, and improve performance with confidence. This course is designed for professionals who already know the basics and want to apply advanced Lean Six Sigma tools to real business challenges.

This is not abstract statistics or theory-heavy training. You’ll use Excel to perform real analysis, interpret results correctly, and apply tools like DMAIC, SIPOC, MSA, hypothesis testing, and regression without memorizing formulas or relying on expensive software.

You’ll learn how to measure baseline performance, analyze process capability, use control charts to maintain stability, and validate improvements using statistical evidence. Templates, worked examples, and structured walkthroughs help you apply each concept immediately.

Learn through a complete, real-world Lean Six Sigma project and develop the skills to lead data-driven improvements with credibility. If you’re ready to move beyond basics and make decisions backed by data, enroll now and take your Lean Six Sigma expertise to the next level.

Explore the Course


Launch your career!

HK School of Management and Technology provides world-class training in Project Management with AI and Agile Methodologies. Practical skills, tools, and guidance you can apply right away. Covered by Udemy's 30-day refund policy.

Learn More