// includes (adjust if your paths differ) Agile Project Management and Scrum with AI

Estimation Workshop Plan

You are an Agile and Scrum training expert. Create a workshop plan where a team practices three estimation methods: Planning Poker, Affinity Estimation, and Bucket System.

Guidelines:

  • Outline a step-by-step plan for the workshop.
  • Include agenda, timing, and required materials.
  • Describe how each method will be practiced with sample backlog items.
  • Highlight learning objectives for participants.

Reflection

At the end, explain in 2–3 sentences:

  • How using multiple methods builds stronger estimation skills.
  • Which method might work best for distributed or co-located teams.

Advanced Lean Six Sigma — Data-Driven Excellence

Solve complex problems, reduce variation, and improve performance with confidence. This course is designed for professionals who already know the basics and want to apply advanced Lean Six Sigma tools to real business challenges.

This is not abstract statistics or theory-heavy training. You’ll use Excel to perform real analysis, interpret results correctly, and apply tools like DMAIC, SIPOC, MSA, hypothesis testing, and regression without memorizing formulas or relying on expensive software.

You’ll learn how to measure baseline performance, analyze process capability, use control charts to maintain stability, and validate improvements using statistical evidence. Templates, worked examples, and structured walkthroughs help you apply each concept immediately.

Learn through a complete, real-world Lean Six Sigma project and develop the skills to lead data-driven improvements with credibility. If you’re ready to move beyond basics and make decisions backed by data, enroll now and take your Lean Six Sigma expertise to the next level.



Launch your Agile career!

HK School of Management helps you master Agile and Scrum—faster. Learn practical playbooks, AI-powered prompts, and real-world workflows to plan smarter, deliver sooner, and keep stakeholders aligned. For the price of lunch, you’ll get templates, tools, and step-by-step guidance to level up your projects. Backed by our 30-day money-back guarantee—zero risk, clear path to results.

Learn More