S-curve diagram

A time-phased chart of the running total of costs, often tracing an S shape as work ramps up, peaks during execution, and tapers near closeout.

Key Points

  • Shows cumulative costs (or value) plotted against time.
  • Characteristic S shape: slow early spending, rapid growth mid-project, flattening at the end.
  • Used to compare planned vs actual and earned value (PV, EV, AC) for variance analysis.
  • Supports forecasting and stakeholder reporting through trend and baseline comparisons.

Example

A 9-month software project tracks planned cumulative spend (baseline) and actual cumulative spend each month. The S-curve reveals slower-than-planned spending in months 2-3, a rapid catch-up during months 4-6, and stabilization as the project enters testing and deployment.

PMP Example Question

Which chart best visualizes the running total of project budget over time for comparing planned and actual performance?

  1. Resource histogram
  2. S-curve
  3. Pareto chart
  4. Control chart

Correct Answer: B — S-curve

Explanation: An S-curve plots cumulative values over time, making it ideal for comparing planned vs actual costs or value.

Advanced Lean Six Sigma — Data-Driven Excellence

Solve complex problems, reduce variation, and improve performance with confidence. This course is designed for professionals who already know the basics and want to apply advanced Lean Six Sigma tools to real business challenges.

This is not abstract statistics or theory-heavy training. You’ll use Excel to perform real analysis, interpret results correctly, and apply tools like DMAIC, SIPOC, MSA, hypothesis testing, and regression without memorizing formulas or relying on expensive software.

You’ll learn how to measure baseline performance, analyze process capability, use control charts to maintain stability, and validate improvements using statistical evidence. Templates, worked examples, and structured walkthroughs help you apply each concept immediately.

Learn through a complete, real-world Lean Six Sigma project and develop the skills to lead data-driven improvements with credibility. If you’re ready to move beyond basics and make decisions backed by data, enroll now and take your Lean Six Sigma expertise to the next level.

Explore the Course


Run the drill before the incident runs you

Design, run and prove OT drills and tabletop exercises before an incident tests your team. OT Incident Drills and Exercises includes 24 lessons and practical exercise materials, delivered through HKSM Courses for US$47 one-time. 30-day money-back guarantee when 50% or less of the course has been consumed.

Explore the Course