precision

In quality management, precision describes the degree of exactness or fineness in results or measurements.

Key Points

  • Precision focuses on how exact and consistent results or measurements are.
  • High precision does not guarantee accuracy; values can be exact yet off from the true or target value.
  • Quality control tools (e.g., repeated measurements, control charts) help assess precision by showing low variation.
  • Requirements may specify precision tolerances (e.g., record to 0.01 units) to guide verification and testing.

Example

During performance testing, five runs show response times of 2.01 s, 2.00 s, 2.02 s, 2.01 s, and 2.00 s. The results are tightly clustered, indicating high precision, even if the target SLA is 1.50 s (which would be an accuracy concern).

PMP Example Question

A QA analyst notes that a measurement device consistently reports values 10 mm above the specification, with almost no variation across repeated checks. What quality characteristic is demonstrated?

  1. Accuracy
  2. Precision
  3. Prevention cost
  4. Conformance

Correct Answer: B — Precision

Explanation: The readings are consistent and tightly grouped (high precision) but not close to the true or target value (low accuracy).

ICS/OT Cybersecurity Fundamentals — Security Built for Industrial Systems

Industrial control systems cannot be secured like ordinary IT. A forced reboot, aggressive scan, or incompatible patch can interrupt production and create real safety consequences. Effective OT security begins with understanding the systems, constraints, and risks unique to industrial environments.

This course gives IT professionals, engineers, operators, and security practitioners a practical foundation in ICS threats, zone and conduit design, risk assessment, passive asset visibility, and vendor evaluation. You will learn how IEC 62443, NIST CSF, and MITRE ATT&CK for ICS apply where availability and safety come first.

Eight reconstructed incidents—including Stuxnet, Triton, Ukraine 2015, Colonial Pipeline, and PIPEDREAM—show how attackers move through OT environments, what they target, and which defenses could have changed the outcome.

Watch the course preview, then build the vocabulary, frameworks, and judgment needed to take credible first steps in ICS/OT cybersecurity.

Explore the Course


ICS/OT Cybersecurity Fundamentals course preview

Run the drill before the incident runs you

Design a 15-minute drill, build a full tabletop and run the room before an incident tests your team. ICS/OT Incident Drills and Tabletop Exercises includes 51 lessons, eight quizzes, four hands-on assignments and the exercise materials, delivered through HKSM Courses for US$47 one-time. 30-day money-back guarantee when 50% or less of the course has been consumed.

Explore the Course