Hierarchical Charts

Hierarchical charts are visual tools that organize project information into parent-child levels to show how high-level items decompose into lower-level components. They help clarify structure, ownership, and scope for analysis and communication.

Definition

Hierarchical charts are used to break down complex project elements into structured levels, such as deliverables, roles, resources, or risks, enabling clearer analysis, estimating, and control.

Key Points

  • Show top-down decomposition from broad categories to detailed components.
  • Common types include WBS, OBS, RBS (resource), and risk breakdown structures.
  • Support estimating, scope control, assignment clarity, and performance reporting.
  • Apply the 100% rule to ensure the sum of children fully accounts for the parent.
  • Do not imply sequence or schedule; they show structure, not timing.
  • Useful for identifying gaps, overlaps, and ownership at each level.

Purpose of Analysis

  • Decompose complexity to make planning, estimating, and control more reliable.
  • Reveal missing components, redundant work, and unclear responsibilities.
  • Align deliverables with accountable owners and required resources.
  • Enable aggregation and roll-up reporting for cost, effort, and risk exposure.
  • Provide a shared visual model to improve stakeholder understanding.

Method Steps

  • Define the objective and top node (e.g., total project scope or risk categories).
  • Select the primary breakdown criterion (deliverable, function, geography, risk source, or resource type).
  • Decompose iteratively into logical, manageable components until control-level detail is reached.
  • Assign unique codes or numbering to each node to support traceability and roll-up.
  • Validate completeness and non-overlap with the team and key stakeholders.
  • Document definitions in a dictionary where needed (e.g., WBS dictionary).
  • Baseline as appropriate and maintain version control as changes occur.

Inputs Needed

  • Project charter and scope overview.
  • Requirements and acceptance criteria.
  • Organizational structure and resource catalog.
  • Risk categories or risk taxonomy (if building a risk breakdown structure).
  • Historical data, templates, and organizational process assets.
  • Assumptions, constraints, and governance guidelines.

Outputs Produced

  • Hierarchical diagram with coded nodes (e.g., WBS, OBS, RBS).
  • Supporting dictionary entries describing each component.
  • Assignment mappings and interfaces to RAMs (e.g., RACI) or estimates.
  • Roll-up structures for scope, cost, effort, or risk aggregations.
  • Updates to plans, baselines, and a change log when the structure evolves.

Interpretation Tips

  • Read top to bottom: parents fully decompose into children; children roll up to the parent.
  • Apply the 100% rule and check for mutually exclusive children where practical.
  • Use codes to trace estimates, schedules, and costs to specific components.
  • Do not infer dependencies or timing; use network diagrams for sequence.
  • Map nodes to owners to clarify accountability and reporting lines.
  • Periodically review for scope creep, gaps, and misaligned responsibilities.

Example

Product launch WBS (high level):

  • 1.0 Product Launch.
    • 1.1 Market Research.
    • 1.2 Product Readiness.
    • 1.3 Marketing Materials.
    • 1.4 Training and Support.
    • 1.5 Release and Rollout.

Each child node has defined scope, acceptance criteria, and estimates that roll up to 1.0.

Pitfalls

  • Mixing different breakdown criteria at the same level, causing overlap.
  • Stopping decomposition too early or going too deep without added control value.
  • Assuming the chart shows sequence, leading to planning errors.
  • Vague or duplicate node names that hinder estimating and tracking.
  • Failing to maintain version control and update related plans and estimates.
  • Building the chart without stakeholder input, reducing buy-in and accuracy.

PMP Example Question

A project has broad deliverables that are hard to estimate. Which tool should the project manager use to decompose the work into manageable components for better estimating and control?

  1. Hierarchical charts.
  2. Responsibility assignment matrix.
  3. Kanban board.
  4. Cause-and-effect diagram.

Correct Answer: A — Hierarchical charts.

Explanation: Hierarchical charts (e.g., a WBS) decompose deliverables into lower-level components, improving estimating, accountability, and reporting. The other options do not provide structured decomposition of scope.

How To Land the Job and Interview for Project Managers Course

Take the next big step in your project management career with HK School of Management. Whether you're breaking into the field or aiming for your dream job, this course gives you the tools to stand out, impress in interviews, and secure the role you deserve.

This isn’t just another job-hunting guide—it’s a tailored roadmap for project managers. You’ll craft winning resumes, tackle tough interview questions, and plan your first 90 days with confidence. Our hands-on approach includes real-world examples, AI-powered resume hacks, and interactive exercises to sharpen your skills.

You'll navigate the hiring process like a pro, with expert insights on personal branding, salary negotiation, and career growth strategies. Plus, downloadable templates and step-by-step guidance ensure you're always prepared.

Learn from seasoned professionals and join a community of ambitious project managers. Ready to land your ideal job and thrive in your career? Enroll now and take control of your future!



Launch your career!

HK School of Management delivers top-tier training in Project Management, Job Search Strategies, and Career Growth. For the price of a lunch, you’ll gain expert insights into landing your dream PM role, mastering interviews, and negotiating like a pro. With a 30-day money-back guarantee, there’s zero risk—just a clear path to success!

Learn More