New in this edition: design a 15-minute drill, build a tabletop and run the room, with worked examples for each.

For the person who has a plan on the shelf and nobody who has practised it

Make Sure the First Test of Your OT Incident Response Plan Is a Drill, Not the Real Thing

A practical course for control engineers and OT security leads. Design a 15-minute drill from one line of your plan, build a full tabletop, run the room, and keep a record of what each run proved.

ICS/OT Incident Drills and Tabletop Exercises

ICS/OT Incident Drills and Tabletop Exercises

51 video lessons, from the plan audit to running a drill twice. 4 assignments, each one with a model answer and a solution video.

TOTAL VALUE: $650

$47 USD one-time

Half price, only with this order

Already have an HKSM account? Use the same email at checkout and the course is added to it.

WHAT IS THIS COURSE?

ICS/OT Incident Drills and Tabletop Exercises teaches you to test an industrial incident response plan before an attacker does. It starts small: one line of your plan, one question, fifteen minutes, on a two-sided card a first-time facilitator can run.

Then it scales up. You build a full tabletop in six steps, learn to run the room when people go quiet, and run the same drill twice so you can show what changed. Every method is worked through on a real-looking example first, then you do it yourself and check it against our model answer.

An incident response exercise binder, a hard hat and a radio in front of a process control screen with active alarms

WHAT YOU'LL BE ABLE TO DO

Find the lines nobody has practised.

Audit your plan and pick the line that would fail first.

Design a 15-minute drill.

Six steps, one observable objective, one plan line under test.

Build the drill card.

A two-sided card a first-time facilitator can run without you.

Read it cold before you run it.

Hand the card to a fresh reader and fix every place they stop.

Build a tabletop in six steps.

Scope, objectives, scenario, injects, what good looks like, and the package.

Run the room.

Open it, keep it moving, and handle silence or one loud voice.

Debrief in five minutes.

Close with a hot wash and a record of what the drill proved.

Run it twice.

Repeat the drill and show what changed between the two runs.

Plan the year.

Place drills and exercises around your outages and your testing deadlines.

HK School of Management and Technology

BUILT BY HK SCHOOL OF MANAGEMENT AND TECHNOLOGY

We teach the people who run, maintain and protect industrial systems. Our ICS/OT courses follow one route: understand the threat, write the plan, then test it. This course is the test.

30,000+ students in 160 countries · 1,300+ five-star reviews across our courses

The Curriculum

Start Here

Three short lessons. What the course covers, the route through it, and how to practise without putting your own plant's details at risk.

Part 1: Test the Plan You Have

Drills, exercises and the rules behind them. Audit your plan, run executive and technical tabletops, meet the testing rules, and learn from two real responses.

Part 2: Design the 15-Minute Drill

One plan line, one question, one card. Design a short drill in six steps and build a card anyone on shift can run.

Part 3: Build a Tabletop

The same method, scaled up. Build a full tabletop in six steps, from scope to the package your facilitator carries into the room.

Part 4: Run the Room

Facilitate, debrief, record, repeat. Run the session well, close it with a record, and run it again to show what changed.

Final Word

What to do on Monday. Your first card, your first run, and your year of drills.

WHAT YOU'LL HAVE WHEN YOU FINISH

A drill card built for your own plant and checked by a cold read. A tabletop outline built from a fact sheet. A facilitator run sheet you can carry into the room. A twelve-month calendar of drills placed around your outages. And the practice of having worked a full ransomware tabletop, Exercise QUIET FEEDER, against a model answer.

WHAT STUDENTS SAY ABOUT OUR COURSES

This edition is new, so these quotes are from other HKSM courses, each labelled with its course.

"Very clear and crisp, straight to the point."

Student, ICS/OT Cybersecurity Fundamentals

"Really useful. I will definitely be able to use many of these techniques and prompts. I was not expecting this to be so practical."

Student, AI for Agile Project Managers and Scrum Masters

"I'm quite familiar with Lean from previous work, but this course is great because it gets to the point and explains concepts clearly. I don't feel like there's any wasted time."

Student, Introduction to Lean Six Sigma

QUESTIONS? ASK IN THE COURSE FORUM

Every lesson sits in our learning site, where you can ask questions in the course discussion forum and share the drill you ran.

HERE'S EVERYTHING YOU GET

  • The Course: 51 Video Lessons in Four Parts From the plan audit to running a drill twice, with a worked example before every assignment.$47
  • Exercise QUIET FEEDER: a Ransomware Tabletop Kit The situation manual, an editable participant workbook and the model answers, ready to run with your own team.$97
  • The Drill Design Kit The drill card template, the design worksheet, two finished cards and a model answer for a water site.$47
  • The Tabletop Build Kit The build workbook, a complete worked tabletop (FROST LINE: build file, facilitator guide, handout and evaluator sheet) and a model outline.$97
  • The Facilitator Kit The facilitator run sheet, a third drill card, a facilitation case with a model answer, and the same card run twice.$47
  • Your Year of Drills on One Page The 12-month drill cadence template, built around your outages and testing deadlines.$47
  • The Control-Room Card The OT indicators of compromise quick reference, to print and keep by the console.$27
  • Your Next Exercise, Designed The OT scenario design template: objectives, injects that escalate, and evaluation.$47
  • The Plan Audit Kit The OT IRP checklist, the recovery readiness checklist, the OT IR field kit and 69 questions for consideration.$97
  • The Course Forum Ask questions and share the drill you ran.$97

TOTAL VALUE: $650

Your price: $47 USD One payment, no subscription.

Half price, only with this order

OUR 30-DAY MONEY-BACK GUARANTEE

Take the course for 30 days. If it isn't what you needed and you have completed half of the course or less, write to us through the Contact page. We refund you in full. The risk is ours, not yours.

Read the Refund Policy and Terms and Policies. Questions? Contact HK School of Management and Technology.

QUESTIONS? WE HAVE ANSWERS.

Is this about writing the plan, or testing it?

Testing it. You design drills, build tabletops and run them. Writing the plan itself is our separate course, ICS/OT Incident Response Plan: Write One That Works.

I bought the earlier edition. What's new?

Three new parts: designing a 15-minute drill, building a tabletop in six steps, and running the room, each with a worked example and an assignment with a model answer. Every lesson from the earlier edition's main part is still there, with a new introduction and a new final word.

Will it fit my site if it's not a power utility?

Yes. The examples include a water site, an electric cooperative and a vendor connection, and every template is built for any industrial site: manufacturing, energy, water, oil and gas or buildings.

Do the drills touch live systems?

No. Every drill and tabletop in the course is a talk-through. Nobody touches a live system.

Will finishing it make my site compliant?

No course can. The course shows what NERC CIP-008-6 and the TSA pipeline directives expect you to test, and how to keep a record of each run. Whether your site meets its obligations is judged on your whole program.

What files do I get?

Word and PDF files: the drill card template, the design worksheet, the tabletop build workbook, the facilitator run sheet, the plan audit kit, the drill calendar, the scenario template, and the full QUIET FEEDER kit with model answers.

How long does it take?

You work at your own pace. Many people design their first card in an evening, after Part 2.

What if it's not for me?

You're covered by our 30-day money-back guarantee. If you've completed half of the course or less, write to us through the Contact page within 30 days and we refund you in full.

Is there a subscription?

No. One payment of $47, with no subscription and nothing to cancel.

Start My First Drill