HKSM › Books › Introduction to Industrial Control Systems › Introduction to Industrial Control Systems

Introduction to Industrial Control Systems

Introduction to Industrial Control Systems — Book Cover

Introduction to Industrial Control Systems

What Every Engineer Needs to Know

Power grids, water plants, pipelines and factories all run on computers most people never see. Introduction to Industrial Control Systems explains how those systems work, in plain language, for engineers, technicians and IT professionals who keep hearing PLC, SCADA and OT but were never taught what sits behind the words.

What This Book Delivers

  • What ICS is, and why it is not IT. The priorities that make industrial systems different, and why you cannot simply reboot a plant.
  • A map you can use. The Purdue model, level by level, from sensors and valves up to the business network.
  • Every major component, explained. PLC, HMI, SCADA, DCS, RTUs, field devices, engineering workstations and historians, and how they work together.
  • Industrial networks without the mystery. Modbus, fieldbus, EtherNet/IP, PROFINET, DNP3, IEC 61850, OPC, ring topologies, and what normal traffic looks like.
  • A clear view of the road ahead. Where these systems are exposed, and what to learn next.

Who It's For

  • Engineers and technicians from electrical, mechanical or instrumentation backgrounds moving closer to control systems.
  • IT and cybersecurity professionals who now work alongside, or are responsible for, operational technology.
  • Anyone preparing for ICS/OT cybersecurity training who wants the foundation first.

How It's Structured

  • Chapters 1-4: what an industrial control system is, how it differs from IT, how it is organized, and what it feels like to operate.
  • Chapters 5-9: the components, one by one, then the whole system working together.
  • Chapters 10-13: industrial networks and protocols, and the gap that leads to cybersecurity.
Start Reading

ICS/OT Cybersecurity Fundamentals — Security Built for Industrial Systems

Industrial control systems cannot be secured like ordinary IT. A forced reboot, aggressive scan, or incompatible patch can interrupt production and create real safety consequences. Effective OT security begins with understanding the systems, constraints, and risks unique to industrial environments.

This course gives IT professionals, engineers, operators, and security practitioners a practical foundation in ICS threats, zone and conduit design, risk assessment, passive asset visibility, and vendor evaluation. You will learn how IEC 62443, NIST CSF, and MITRE ATT&CK for ICS apply where availability and safety come first.

Eight reconstructed incidents—including Stuxnet, Triton, Ukraine 2015, Colonial Pipeline, and PIPEDREAM—show how attackers move through OT environments, what they target, and which defenses could have changed the outcome.

Watch the course preview, then build the vocabulary, frameworks, and judgment needed to take credible first steps in ICS/OT cybersecurity.

Explore the Course


ICS/OT Cybersecurity Fundamentals course preview

Run the drill before the incident runs you

Design a 15-minute drill, build a full tabletop and run the room before an incident tests your team. ICS/OT Incident Drills and Tabletop Exercises includes 51 lessons, eight quizzes, four hands-on assignments and the exercise materials, delivered through HKSM Courses for US$47 one-time. 30-day money-back guarantee when 50% or less of the course has been consumed.

Explore the Course