NotPetya arrived inside a mandatory tax software update. Within hours, Maersk lost 45,000 workstations and 4,000 servers across one flat network. Chapter 7 shows which security program elements were missing.
How to Secure the Industrial Systems You Answer For, Without Becoming a Hacker or Breaking the Process
1111. In November 2023, that factory default password let a group tied to Iran's Revolutionary Guard into industrial controllers at US water utilities. Chapter 10 explains why default passwords survive commissioning, and Appendix A gives you the worksheet that finds them.
Built on public sources: the IEC 62443 series, the NIST Cybersecurity Framework, MITRE ATT&CK for ICS, and published incident reports
Each one traced to the control that would have changed the outcome
NotPetya arrived inside a mandatory tax software update. Within hours, Maersk lost 45,000 workstations and 4,000 servers across one flat network. Chapter 7 shows which security program elements were missing.
A German steel mill lost control of a blast furnace after an attack that began with email to the office. Chapter 8 names the three detection gaps that were open at the same time.
Engineers at energy sites downloaded an update from their vendor's official website. It installed a reconnaissance tool. Chapter 13 shows how IEC 62443 judges the vendors and service providers you already trust.
Thirteen chapters in five parts, from what a PLC actually does to an IEC 62443 risk assessment, plus 22 printable reference cards and worksheets
The book, a printable toolkit for your site, and both formats
Five parts, from what a PLC actually does to an IEC 62443 risk assessment. Every chapter closes with questions about your own environment: which connections make you uncomfortable, where the IT and OT boundary sits, what you could answer from your logs today. Use them alone, or take one chapter a week to a team meeting.
Value $19.99
The zone and conduit design checklist, the OT DMZ design checklist, the secure remote access controls checklist, the default credential audit worksheet, the ICS risk assessment worksheet, the zone security level gap analysis worksheet, and sixteen more. Every one is reproduced in Appendix A, and all 22 come as full-size printable PDFs in one download. Each page names the chapter it comes from.
Value $49
Search the PDF on your laptop when a question comes up in a design review. Read the EPUB on a phone, a tablet or an e-reader on the way to site. In the EPUB, tap any diagram to open it full screen.
Included in the book price
Total value: $68.99. Your price today: $19.99, one payment.
Read it for 30 days. If the book is not what you needed, for any reason, write to us through the Contact page within 30 days of your order and we refund you in full. No questions, no conditions. The risk is ours.
Read the Refund Policy and Terms and Policies.
Total value $68.99. Yours today for $19.99. Covered by our 30-day money-back guarantee.